Mk III Hulls 1 and 2 under construction
Click images to view larger
This is a three man shop, Boss and two men.
Day 1
![]() |
Lofted the side and marked the stations for construction in the morning
The boys cut the plate and all the vertical frames for two boats
Day 2
![]() |
![]() |
![]() |
Laying out and tacking the frames
All tacked out by lunch, should be stitch-welded by day end
One man out for the Afternoon
Day 3
Fully stitched, frames painted, second plate marked and cut
again, a man short due to snow storm
Day 4
Second Side Tacked in the morning for a half day's work
Day 5
Lining out the Channel Coolers
Day 6
Welding down the Channel Coolers
Day 7
Repeat for hull # 2
Day 8
Four sides, Eight Days, Two men and the Boss, and they still managed to tweak a fishing boat in the middle.
At this point a month long hiatus while other jobs are performed
Spring morning with modular sections stacked outside. Modular barge sections festooned with parts of Pushtug all waiting for assembly.
| Manny sets up the automatic cutter | And the Deckhouse lower unit goes together |
![]() |
![]() |